Skip to main content
Try M-Files Free for 30 Days!Start Trial
READY-TO-DEPLOY SOLUTIONENGINEERING · QUALITY · OPERATIONS

M-Files for Manufacturing — The Right Revision, Every Time

Connect drawings, specifications and quality records to the products, parts and suppliers they govern. Engineering changes follow a controlled path, only the current approved revision reaches production, and every transmittal is tracked.

Engineering change control · Supplier transmittals · Revision-locked release · Audit-ready records

Only the approved drawing is available at the point of use
ISO 9001 aligned

Changes are authorised before documents are edited and released only after final review. The previous revision is superseded automatically.

301%

Up to ROI

Return on investment reported by M-Files for manufacturing customers

2

Governed Workflows

Engineering Change Control and Transmittal Management, pre-configured

~500 hrs

Saved per Year

Reported by Vahterus from automating a standard-product process

100%

Traceable Changes

Timestamped approvals and version history held against every document

ROI and customer figures are published by M-Files and its customers (Vahterus). Results vary by organisation.

WHERE DOCUMENT CONTROL BREAKS DOWN

Sound familiar?

Four problems we hear from Australian engineering and manufacturing teams before they formalise document control.

The wrong revision on the machine

An operator cuts to a superseded drawing. The cost is scrapped material, rework and, sometimes, a warranty conversation with the customer.

Changes tracked in spreadsheets

An engineering change lives in an email thread and a log nobody trusts. Reviewers are missed, and nobody can show why a tolerance changed.

Supplier drawings by email

Subcontract fabricators receive attachments with no proof of delivery, no acknowledgement and no way to recall the old version.

Weeks of audit preparation

Before every ISO 9001 surveillance audit, quality staff collate revision histories, approvals and training records from five different places.

FROM ENGINEERING TO SHOP FLOOR

Four capabilities, built for controlled production

M-Files links documents to the products, parts, processes and suppliers they belong to, then governs how they change.

Product record linked to its drawings, specifications, BOM and supplier documents
Click to enlarge
1

Drawings and records in context

Drawings, specifications, BOMs, quality records and supplier documents are connected to the products and parts they relate to. Teams find the current approved revision without browsing folders or digging through attachments.

  • ✓One record per document with revision, status, owner and related part
  • ✓Role and metadata-based permissions, including for sensitive designs
  • ✓Works alongside your existing ERP and PLM tools rather than replacing them
Single Source of TruthRevision ControlRole-Based Access
Engineering change workflow showing change approval, document approval and revision-locked release
Click to enlarge
2

Closed-loop engineering change control

A change moves through initiation, multi-discipline technical review, approval, execution and formal closure. Two gates keep it honest: the change is authorised before anyone edits a document, and documents are released only after final review.

  • ✓Revision-locked release: the superseded drawing is withdrawn automatically
  • ✓Reviewers across engineering, quality and production with clear deadlines
  • ✓ECO/ECN and MOC audit trail captured automatically as evidence
ECO / ECNTwo-Gate ApprovalAuto-Superseding
Transmittal register showing supplier packages, delivery status and acknowledgements
Click to enlarge
3

Supplier transmittals you can prove

Send purpose-coded drawing and document packages to subcontractors and customers through M-Files Hubshare. Suppliers get what they need and nothing more, with no access to your internal vault.

  • ✓Permission-isolated external portal, no internal vault access required
  • ✓Acknowledgement tracking against a delivery deadline
  • ✓Real-time transmittal register showing who received which revision
M-Files HubshareAcknowledgement SLAsTransmittal Register
Audit report showing a drawing’s complete revision, approval and distribution history
Click to enlarge
4

Audit-ready, every day

Version history, approvals, e-signatures and audit trails are captured as work happens. Supports ISO 9001 and sector standards such as AS9100 and ISO 13485, so an audit becomes a report, not a project.

  • ✓Pull a document’s full revision and approval history on demand
  • ✓Evidence for ISO 9001 Clause 7.5 documented information
  • ✓Pairs with M-Files for Quality for CAPA, NCR and audit management
ISO 9001AS9100 / ISO 13485Full Audit Trail
THE CHANGE LIFECYCLE

From change request to released revision

The change process is modelled in the vault. Range tunes reviewers, thresholds and notifications to your organisation.

  1. Step 1

    Initiate

    Raise a change with the affected parts, drawings and reason. Impacted records are linked automatically.

  2. Step 2

    Review

    Engineering, quality and production reviewers assess the change against their own discipline.

  3. Step 3

    Approve change

    The change is authorised before anyone edits a controlled document.

  4. Step 4

    Approve documents

    Updated drawings and procedures go through a final review and are released at the new revision.

  5. Step 5

    Release and notify

    The old revision is superseded, suppliers receive a tracked transmittal, and the change is closed.

PRE-PACKAGED ASSETS

What is included in the Ready-to-Deploy vault?

Two governed workflows plus the document structure that supports them, ready to adapt to your plant.

✓ Engineering Change Control workflow

Initiation, multi-discipline review, approval, execution and closure, with revision-locked release and an automatic audit trail.

✓ Transmittal Management workflow

Purpose-coded packages for outbound and inbound exchange, delivered through Hubshare with acknowledgement tracking.

✓ Controlled document classes

Drawings, specifications, work instructions, procedures, inspection plans and supplier documents with revision and status properties.

✓ Product, part and supplier records

The relationships that let a team start from a part number and see every governing document.

✓ Microsoft 365 and CAD

Work in Office and Teams. The AutoCAD integration manages xrefs and embeds M-Files properties in drawings. Other CAD tools are assessed at scoping.

✓ Coexistence with ERP and PLM

M-Files complements systems such as SAP, Teamcenter and Windchill. It is not a PLM replacement.

Engineering Change Control and Transmittal Management are available on M-Files Cloud. Hosting, CAD and ERP requirements are confirmed with Range at scoping.

READY-TO-DEPLOY VS BUILDING FROM SCRATCH

Why start from a pre-built vault?

Shared drives and spreadsheets cope until something goes wrong. A governed vault makes the right behaviour the default.

CapabilityShared drives and spreadsheetsM-Files for Manufacturing
Drawing revisionsFile names such as Part_v4_FINAL_revB.dwg and trustControlled revision, status and automatic superseding
Engineering changesEmail threads and a change log spreadsheetTwo-gate workflow with every approval timestamped
Supplier exchangeEmail attachments with no proof of receiptHubshare transmittals with acknowledgement tracking
Point-of-use accessPrinted binders that go out of dateOnly the current approved revision is available
Audit preparationManual collation from multiple locationsRevision and approval history available on demand
Scaling across sitesEach plant develops its own habitsOne standard process across plants and acquisitions
HOW RANGE DELIVERS IT

We fit it to your plant, not the other way round

Range is an Australian M-Files partner with deep experience in ISO 9001 and quality systems.

1

Assess your current state

We review how drawings, changes and supplier exchange work today, and where audit findings tend to arise.

2

Configure the vault

We tailor document classes, change roles, approval gates and notifications to your process and standards.

3

Migrate and connect

We bring controlled documents in from shared drives with metadata and revision states, and link ERP or CAD tools as scoped.

4

Roll out and train

Engineers, quality and production staff are trained for their own role, with supplier onboarding for Hubshare transmittals.

★★★★★
“Having worked with Range Information Systems for a number of years, I can confirm that their implementation and support of the M-Files product is second to none. If you’re looking for a partner to work with who listens to your requirements and tailors a solution to meet your needs, then look no further than Phil and his team.”

Graeme Easton MCSE

Systems Administrator & Support — MM Group Services Pty Ltd

MM Group Services Pty Ltd

Gartner Magic Quadrant

Leader & Visionary in Enterprise Content Services

Forrester TEI Study

Validated 301% ROI over 3-year enterprise horizon

Nucleus Research

Ranked Leader 10+ consecutive years for usability

Certified Partner

Range is an Australian M-Files partner since 2012

FREQUENTLY ASKED QUESTIONS

Questions about M-Files for Manufacturing

Answers for operations managers, quality leads and engineering directors.

1. What is M-Files for Manufacturing?↓
It is a document management solution for engineering-intensive manufacturers. It connects change control and document exchange to the products, assets and suppliers they govern, so the only drawing anyone can build to is the current, approved one.
2. Does it support ISO 9001 document control?↓
Yes. Controlled documents carry a status, owner and revision, only approved versions are released, superseded revisions are retired automatically, and every change is recorded in an audit trail, which supports the document control requirements of ISO 9001 clause 7.5.
3. How does engineering change control work?↓
A change moves through initiation, technical review, approval, execution and closure. It is authorised before any document is edited and released only after final review, at which point the previous revision is superseded and the audit trail is already complete.
4. How do we share drawings with subcontractors securely?↓
Through Transmittal Management and M-Files Hubshare. You send a purpose-coded package to the supplier, they access only that package through a permission-isolated portal, and the register records delivery and acknowledgement. They never enter your internal vault.
5. Does it replace our PLM or ERP system?↓
No. M-Files is not a PLM replacement. It complements tools such as SAP, Teamcenter, Windchill and AutoCAD by governing the documents and exchanges around them.
6. Does it integrate with our CAD software?↓
M-Files offers an AutoCAD integration that manages xrefs and embeds M-Files properties in drawings. Requirements for SolidWorks, Inventor or other tools are assessed during scoping so we can recommend the right approach.
7. Does it help with ISO 9001 audits?↓
Yes. Version history, approvals, e-signatures and audit trails are captured as work happens, giving you evidence for documented information requirements. It also supports sector standards such as AS9100 and ISO 13485. Certification remains with your auditor.
8. Can it be installed on-premises?↓
Engineering Change Control and Transmittal Management are available on M-Files Cloud. If you need another hosting model, Range will advise on the options at scoping.
9. What about CAPA and non-conformances?↓
CAPA, NCR and audit management are the focus of M-Files for Quality, which pairs naturally with this solution. See our Quality Management page for the full picture.
FREE PDF BROCHURES, EMAILED TO YOUOfficial M-Files collateral

Take the detail with you

Choose the PDF you want and we will email it straight to your work inbox, ready to share with your team.

Choose your PDF
Delivered to your inbox within minutes

Email me the PDF

Free

We will send the PDF you selected to your work inbox.

No spam. Range IT & Range IS respect your privacy under the Privacy Act 1988.

Ready to put the right revision in front of every operator?

Book a 30-minute walkthrough of M-Files for Manufacturing with Range’s Australian information specialists. We will map it to your change and supplier process.